Library Extension, University of Leciester, England
Client: Mariott Construction
Duration: 6 Months
Duration: 6 Months
Status: Complete
Value: 1,200,000.00
Value: 1,200,000.00
Further Information
Marriot Construction have been appointed the Main Contractors to carry out a four floor extension at the University of Leceister, England. The entire structure is made from a combination of precast concrete products and in-situ concrete.
OBConstruction along with Creagh Concrete Products undertook the contract to provide the concrete structure using the latest formwork systems and precat concrete products.